Flooring jobs lose margin when measurements are rushed and material orders aren't reconciled to actual waste. OptiServe AI ties your room-by-room takeoffs to material orders, subfloor documentation, and installation schedules so every job lands on budget.
✓ 30-day free trial | No credit card required | Cancel anytime
Takeoffs, subfloor logs, acclimation records, and installation schedules in one platform.
Measure square footage per room, apply waste factors by material type (hardwood, tile, LVP), and generate a cut list and material order in minutes.
Photograph and log subfloor conditions (moisture readings, deflection, existing overlay) before installation begins. Protect yourself from post-install moisture damage disputes.
Record material delivery date, acclimation start date, temperature, and humidity readings per job. Manufacturer warranty compliance starts with documented acclimation.
Schedule demo, subfloor prep, and install phases on separate crews. Material delivery windows sync with the install schedule automatically.
Capture existing conditions and completed floors per room. Dispute resolution and warranty claims are settled with timestamped visual evidence.
Collect deposits on signing, mid-project payments on material delivery, and balance on completion. Track outstanding balances across all active projects.
No per-job fees. One flat rate for your whole installation team.
For owner-operators and small residential flooring shops getting off paper estimates.
For flooring companies running residential and commercial installation teams.
For established flooring contractors managing multiple project types and subcontractors.
For multi-location flooring groups needing custom integrations and white-label portals.
All plans include a 30-day free trial. No credit card required.
Hardwood, tile, LVP, and commercial carpet specialists.
"Subfloor moisture documentation ended a $12,000 dispute. The customer claimed the hardwood cupped because of our installation. Our pre-install moisture readings told a different story."
"Material takeoffs used to take my estimator 90 minutes per house. With the room-by-room tool it is 20 minutes and the order goes straight to our distributor."
"Acclimation logs sound like an annoying extra step until a manufacturer warranty claim requires them. We had a claim honored last year specifically because our documentation was complete."
Get your takeoff tool, subfloor logs, and installation schedule running before your next measure appointment.
✓ 30 days free | Setup in under 10 minutes | Cancel anytime